Pictures taken on 03/21/2010
Fridge will go here
Blacksplash still to come
Giallo Fiortio granite
Giallo Fiortio granite
Gas line for the gas dryer
Kitchen Electronic dustpan for central vacuuming system
13x13 Kitchen ceramic tile floor
Castle de Verre  Chalice Gold
Kitchen tile border by Family Room floor which will be carpeted
Guardian aligned the plates nicely now
Master Bath Moen shower control
Basement view of under kitchen cabinet area showing the gray electonic dustpan gray hose which is connected to the central vacuuming system..
Master control box for cable/ethernet/alarm, etc.
Battery backup for alarm system
Bladderless water pressure tank

http://www.amtrol.com/pdf/9040-538%2002_10%20MC7080%20CHAMPION%20Brochure.pdf
Some paint samples- Solarium ceramic tiles,
13x13 Castle de Verre  Gray Stone
C300 4matic loaner car
Corrected installation of front door intercom
Siding will be replaced here
New walkway installed
Courtland going up on lot #17
Courtland going up on lot #17
Trench for electrical and natural gas infrastructure
Trench for electrical and natural gas infrastructure
The following pictures were taken on Sat. 03/27/2010:
Shutters and front door painted Foxhall Green
Staining of banisters
Electrical outlets done. Backspash to come...
Central vacuuming system unit in the garage
Various ceramic tiles we have in the house...
Small window in media room, facing rear of house.
Styrofoam cover in place for now.
Master control panel for alarm, cable, networking, etc.
Front door intercom