This website documents the construction of our home from start to finish.
1
Home
About Us
Emerald Estates
1st FL
2nd FL
Finished Basement
NJ/PA Waverlys
Map
Groundbreaking
Pouring of the foundation
Framing 1
Stakes are placed
Sold sign
CJS Investments, Inc.
This page was last updated: June 2, 2024
Footings
Framing 2
Framing 3
Framing 4
Roof and Windows
Guardian walk-through
House wrap and siding start
Siding
Fireplace stone
Insulation
Drywall
Solarium exterior
Drywall taping
Open design
Interior woodwork
Primer, FloorTile and Well 1
Primer, FloorTile and Well 2
Fireplace
Granite, Front walkway
Driveway
Grading and Landscaping
Hardwood
Carpeting, backsplash
Rear Steps
Interior 4/24/10
Electric, Gas 1
Electric, Gas 2
Pre-Closing
Closing
Exterior 05/28/10
Interior professional painting
JS moving day
Furniture 1
Furniture 2
Furniture 3
July update
Ceiling fans and chandelier
August 2010 update
MyRyanHome
September 2010 update
October 2010 update
November 2010 update
December 2010 update
Crack repair
Christmas 2010
Snow
2011
Our blog
Attic
New
Central Vacuuming
Waverly map
2012
Satellite photo
Sandy
2013
2014
2018
2019
May 2024 Drone photo